top of page

Installers Portal
COMPLETED
Site Contact
CULLEN PATTERSON -
(519) 939-1412
Site Time Log
CHECK IN
Oct 10, 02:34 PM
CHECK OUT
Oct 10, 03:17 PM
Total HRS
On Site
00:43:05
Job Details
ADDRESS
DESCRIPTION
- INSTALL 4 OCTOLUX STRIPS PER FLOOR IN THE ELEVATOR LOBBY TO "SEPERATE" THE WALLCOVERINGS"
- UPPER FLOORS EXCEED 96" LENGTHS AND WILL NEED SEAMS NEAR TOP TO EXTEND THE STRIP AND RUN UP THE WHOLE WALL
** BRING ELECTRIC SAW TO CUT STRIPS ONSITE TO CORRECT MEASUREMNTS***
** CLIENT NOTED THAT FLOOR 29 @ 4090 WAS NOT COMPLETE. CHECK EVERY FLOOR AND ENSURE STRIPS ARE FINISHED**
(DEV-7159)
- OCTOLUX STRIPS
- UPPER FLOORS EXCEED 96" LENGTHS AND WILL NEED SEAMS NEAR TOP TO EXTEND THE STRIP AND RUN UP THE WHOLE WALL
** BRING ELECTRIC SAW TO CUT STRIPS ONSITE TO CORRECT MEASUREMNTS***
** CLIENT NOTED THAT FLOOR 29 @ 4090 WAS NOT COMPLETE. CHECK EVERY FLOOR AND ENSURE STRIPS ARE FINISHED**
(DEV-7159)
- OCTOLUX STRIPS
Site Check In Override
Check In Date & Time
successMessage
Job Log
Installation Details/ Notes
Resolved Issues On Site (If Any)
Add Install Photos
Are you ready to mark this job as completed?
Your completed job was logged successfully!
WOULD YOU LIKE TO LEAVE NOTES FOR ANOTHER INSTALLER OR YOURSELF?
Your install for today was successfully logged.
WHY CANT YOU COMPLETE THE INSTALL?
Your issue was reported successfully.
Important links
SkyNet
© 2019 - 2025 Sign Network Architectural Products Inc. | All Rights Reserved.
Version 1.0
bottom of page
