top of page

Installers Portal

ON SITE

4200 Bathurst (MU) T2 - 2ND

TRICAN

Justin Janowski

Site Contact

Henry Dwinnell - (416) 821-2527

Site Time Log

CHECK IN

May 20, 02:18 PM

CHECK OUT

00:00

Total HRS
On Site

462:31:44

Job Details

ADDRESS

DESCRIPTION

** FROM CLIENT**
"The typical floors will have a mirror on the center of the wall opposite the elevator doors in between the two wall sconces..  This is where you would typically put the directional signage.  I am suggesting it be installed to the right of the right wall sconce.
At the Ground floor, we are installing artwork on the left and right side of the wall across from the elevator doors.  So, in this case we have designed a larger directional sign to be installed in the centre of this wall in between the wall two center wall sconces."

Site Check In Override

Check In Date & Time

successMessage

Job Log

Installation Details/ Notes
Resolved Issues On Site (If Any)
Add Install Photos
Choose File

Are you ready to mark this job as completed?

Your completed job was logged successfully!

WOULD YOU LIKE TO LEAVE NOTES FOR ANOTHER INSTALLER OR YOURSELF?

Add photos

Your install for today was successfully logged.

WHY CANT YOU COMPLETE THE INSTALL?

Add photos

Your issue was reported successfully.

Important links

SkyNet

  • Instagram
  • LinkedIn
  • Pinterest

© 2019 - 2025 Sign Network Architectural Products Inc. | All Rights Reserved.

Version 1.0

bottom of page