top of page

Installers Portal
ON SITE
Site Contact
Graham King -
(416) 318-5680
Site Time Log
CHECK IN
Dec 16, 03:43 PM
CHECK OUT
00:00
Total HRS
On Site
4180:20:46
Job Details
ADDRESS
DESCRIPTION
Day 1
P6-P16 EXHAUST AIR SHAFT
P6 to P1 (all levels) : ELEVATOR LOBBY SIGN (i.e. P6-02.2 ELEVATOR LOBBY)
P3-09 BIKE ROOM.
P2-01A ORGANIC GARBAGE
Take P1 running men signs (left right down) for P1. Speak to Emile regarding install, make sure you have a packing slip as site mentioned they may want to hold onto them.
install remaining secondaries in P level and up tower.
Day 2
electrical for EX1 and EX2 signs
P6-P16 EXHAUST AIR SHAFT
P6 to P1 (all levels) : ELEVATOR LOBBY SIGN (i.e. P6-02.2 ELEVATOR LOBBY)
P3-09 BIKE ROOM.
P2-01A ORGANIC GARBAGE
Take P1 running men signs (left right down) for P1. Speak to Emile regarding install, make sure you have a packing slip as site mentioned they may want to hold onto them.
install remaining secondaries in P level and up tower.
Day 2
electrical for EX1 and EX2 signs
Site Check In Override
Check In Date & Time
successMessage
Job Log
Installation Details/ Notes
Resolved Issues On Site (If Any)
Add Install Photos
Are you ready to mark this job as completed?
Your completed job was logged successfully!
WOULD YOU LIKE TO LEAVE NOTES FOR ANOTHER INSTALLER OR YOURSELF?
Your install for today was successfully logged.
WHY CANT YOU COMPLETE THE INSTALL?
Your issue was reported successfully.
Important links
SkyNet
© 2019 - 2025 Sign Network Architectural Products Inc. | All Rights Reserved.
Version 1.0
bottom of page
